Daily Prompt: feel a bit muggy out there

This is my entry to the freewriter house daily prompt.
The research institute has been having a bit reconstruction out in there gate side. They are trying to expand the main gate so that it can nowbe double in which people can now come in through one side and at the same period move out through the other side without any delay or one having to wait for others to smoothen the movement. In the
Wall side they also are trying and has already built walls inside then the surroundings would be a bit spacious.

All these construction going on are really amazing and beautiful and they are trying there best in that in which tbeg are doing. Construction banner was there at least people are aware and since they have three gates people would be making use of the other two's unless you are trekking and not with your vehicle.
The other day i was passing through the institute and not that the gate side feel a bit muggy out there because of the sand and water there but in all it is alright.

We keep hoping for the Best
Thanks for Visiting my blog
Positivity is our Watchword



0
0
0.000
2 comments
avatar

⚠️⚠️⚠️ ALERT ⚠️⚠️⚠️

HIVE coin is currently at a critically low liquidity. It is strongly suggested to withdraw your funds while you still can.

0
0
0.000